Work to make Luton railway station accessible to start in February
Upgrades to Luton’s railway station are set to start in February 2026, according to Network Rail.
The ‘Access For All’ scheme will make the station disabled-friendly, with lifts added to the platforms.
This comes after years of campaigning and renewed pressure from Cllr James Taylor.
The Hightown councillor’s petition calling for urgent improvements to the station has passed more than 10,000.


He said: “It demonstrates the strength of feeling across the town. We’ve seen upgrades up and down the line, but for whatever reason, Luton’s been left out.
“We need a town centre station fit for the 21st century, or even the 20th. It’s not even wheelchair accessible at the moment.”
The councillor has also called for the station to be completely rebuilt.
He explained: “The station building doesn’t have any notable architectural value, so we’re pushing for a complete rebuild.”
“Network Rail accepts that redevelopment is needed. We’re commissioning a feasibility study with Thameslink, Network Rail and Luton Rising to see what’s possible.”
Network Rail confirmed the work to get the station up to an accessible standard would last for a year.
Rachel Hopkins, MP for Luton South and South Bedfordshire, said: “Luton Station is the gateway to our town centre, and I have long campaigned for redevelopment to ensure it is accessible for everyone and reflects the dynamic and vibrant nature of our town.
“I’m very pleased that lifts to all platforms are finally being delivered, with the main installation starting in the new year.
“This is a promising step, but it should be just the beginning.”
She met with the Rail Minister, Lord Hendy, to discuss progress on the work and the potential for future redevelopment.
Ms Hopkins added: “I will continue to make representations in Parliament and work with local stakeholders to push for further upgrades to our station to ensure it meets the needs of our town.”
Meanwhile, Sarah Owen MP is pushing for more to be done about Leagrave station.
The Luton North MP said: "Ever since I was elected in 2019, I have been campaigning to get much-needed lifts installed at Leagrave station.
“It is unacceptable that a major commuter station used by millions every year does not have step-free access to two of its platforms.
"Back in 2022, I secured a feasibility study on the installation of lifts, and before the 2024 election, Leagrave was listed to receive Access for All funding.
“However, the Conservative government did not release any funds for these upgrades.”
Ms Owen also met with the Rail Minister and “will continue to push to ensure we get the upgrades Luton North's commuters deserve."
